sounds like mine
No buttons as well
Is not finish size. Maybe smaller. Is rough sizing.
Push to start though.
nope not that one lol but that’s a really cool idea. I think a lot of people are going to like that shit.
Wait for finish neoBOX dual. Is have some surprise I not say yet
Is there any preorder list?
Usually he will announce that preorders are open then it’s first come first serve from there.
We make for customer. But maybe can sell for you. What need?
I make Survey for this one later today.
Do you have something that would be a good fit for a full sized electric motorcycle??
Maybe can adapt for bike but we not make bike before. I can checking when we get back fro factory.
That would be amazing. I really would love to build my own electric motorcycle!
Just so everyone is aware the mr60 has the exact same 3.5mm bullets as what is used on the unity phase leads.
The ones people were always worried were too small lol.
I was referring to the wire gauge, not the connector.
Any plans for a 100v - 150v vesc in the future ??
Shh don’t rush him, first let the masses go crazy on the NEOBOX, next you and I grab the 18-20S upcoming ESC and dust everyone in next passes.
After Jeff got some money back in the trunk, he orders his slaves to engineer that swift 150v ish controller.
Then we build Skynet/Légion offspring with it based on a super lethal mountain board with unicorn arms swinging around.
After few years of fighting with the new unicorn offsprings, we’ll sit back with a glass of something while losing and think “When did it go wrong?”
Tldr : Jeff some people here including me really need that high voltage ESC ASAP.
And more seriously wish you strength and health during the virus crisis.
Or you could machine the enclosure and let the heatsink out.
I might let you early face planters buy first I will wait for the bug fixed version.