60a total or 60a per motor?
60a total, I run 20a battery each side and 60a for the motors each with no issues
Iāve just come across this build log, Iām building something super similarā¦did you finish it?
Sadly not. Still sitting with a VESC dilemma. Was hoping to get on the Neobox train. But that ended like it did. So currently waiting to see how Stormcore and the future TB VESC is going to end up.
i was in the same situation re Neoboxes. I opted for the Maker X instead, which arrived todayā¦only I ordered the wrong one so am back in your boat. waiting as i return item etc more drama smh
did you build the NESE? Ill be building an NESE too, though am a little daunted re the wiring side.
Iāve been lazying while watching the Neobox stuff. Iām still looking at different ways to change the NESE design to make it smaller. Though Iām most likely going to separate the VESC and mount it at the back in its own case to fit the NESE without issue.