Oh I forgot Kevin had some. Good call. Thank you
Your ampacity math is wrong son
One layer of 0.2 nickel is ample
i was just told i should prob do two if i plan on pushing the boad 4wd later.
I may have lead him astray here. He’s going 10p of 40t, and 4wd (at some point, so I figured better safe than sorry and overbuild it with 2 layers of nickel. Thats how I would do it on a customer’s pack anyway
one layer would need 6 4p nickel strips per P pack. 3 top 3 bottom.
thats 72 pieces.
$60.
and thats one layer.
you’re not the only one that said two layers was a good idea.
I’m happy with one if one is gonna cut it.
id prefer to over build it , rather than under build it.
I completely understand that mentality. I still feel that one strip is heaps.
I order 1kg of 30mm .2mil 2 weeks ago from ali. Who knows when it will arrive but ill see if you need some still when it arrives.
I’m happy with one strip then. Less work for me lol.
I just wanna get this thing built.
I’ve got some still if anyone needs
I’d like to try some, would you please PM me about the cost?
I’ve also noticed some 30mm are a lot more stiff and some 30mm are super malleable. They both past the salt test so… idk
One of them could have another alloy mixed in that doesn’t rust. Maybe some stainless steel?
Did you notice that with the last package I sent you?
Yea, but even with my normal 10mm some are different. Kinda weird
+1
I measured the “stiff” batch and it was slightly thicker, but that cant be the the whole story.
I have some 30mmx .2 and .25x .15 but I’m super lazy with shipping. PM if interested
edit: using it right meow
@KaramQ
Placed my order with https://derelictrobot.com
Thanks @DRI
@longhairedboy you can close this.