That depends on a lot of things. Including, but not limited to, how specifically the nickel will be welded.
The best solution is likely to obtain the materials you need before you make it. Any other solution is likely to be worse.
But engineering is all about optimizing for goals and objectives — and if “fast” is high on your priority list then I might direct you to this tidbit: